• Load the test run
  • 1

Load the test run

  • 26/09/2017 08:39:06

Load the test runLoad the test runAir run test no problem, but also to carry out not less than 2h load test run.The purpose is to test the following items. (1) temperature measurement and control systemWhether the temperature measurement is accurate,Wh