• Assembly and maintenance
  • 1

Assembly and maintenance

  • 11/09/2017 09:08:43

Assembly and maintenance Before the assembly, the runner should be carefully polished. This operation is followed by the runner surfaceSubtle inspection, especially in the case of processing PVC, should check the flow surface of the chromeFloor. At the s

Recent News

Casting PA film and production technology

Casting PA film and p…

Casting PA film and production technology 1. Casting PA fi…

Cast film mechanical winding device

Cast film mechanical …

Cast film mechanical winding device Corona treatment devic…

Downstream production line auxiliaries

Downstream production…

Downstream production line auxiliaries Thickness measure…

Casting film production line in the cooling device

Casting film producti…

Casting film production line in the cooling device Casting…

Tags